Restore nitrification after prolonged process failure with Bioremove AM

Discover how a Belgian meat processing facility restored stable nitrification after more than six months of biological treatment failure by combining optimised pretreatment with Bioremove™ AM.

For more than six months, nitrification in the biological treatment process had been reduced, while effluent parameters increasingly exceeded environmental permit limits.

Working closely with the customer, OQEMA identified two key areas for improvement: reducing the load entering the bioreactor through optimised primary treatment and rebuilding a more robust nitrifying and denitrifying biomass with Bioremove™ AM.

Download the complete case study to discover how the combined approach restored stable nitrification without requiring an additional treatment step.

More - Water Treatment Case study Restoring nitrification through targeted wastewater treatment (3).pdf

Nitrification restored

Stable nitrification was restored by week 7.

Ammonia reduced to 0 ppm

Effluent NH₄⁺ decreased from approximately 70 ppm to 0 ppm.

No additional treatment step required

The process was stabilised without changing the customer’s operating conditions or investing in additional treatment steps.

Case study Bioremove AM
Case study Bioremove AM

From prolonged treatment failure to biological recovery

At the Belgian meat processing facility, nitrification had been reduced for more than six months. The usual natural recovery did not occur, and effluent parameters increasingly exceeded the limits of the environmental permit.

Rather than focusing solely on the biological treatment stage, OQEMA reviewed the complete treatment process. The analysis showed that improving pretreatment was essential to create better conditions for rebuilding the biological system.

The existing primary treatment was therefore optimised by changing from an amphoteric to a cationic flocculant. This significantly improved turbidity reduction and stabilised the water quality entering the bioreactor.

WT_Case study_Bioremove
WT_Case study_Bioremove

Rebuilding a robust biomass

Once the pretreatment had been stabilised, dosing of Bioremove™ AM began. The selected microorganisms helped establish a stronger culture capable of coping with changing operating conditions and toxic shocks, including exposure to biocidal cationic surfactants used during mandatory disinfection.

Nitrification activity returned immediately under difficult conditions. Over the following weeks, the biomass continued to strengthen until the microorganisms reached critical mass in the sludge.

By week 7, ammonia levels were below the environmental permit limits, and by week 9 they had reached 0 ppm. According to the case data, no comparable failure has occurred since.

The result demonstrates the importance of looking beyond a single treatment stage: optimising the pretreatment first created the conditions needed to rebuild a resilient nitrifying biomass and restore stable nitrification.